Hi - I'm new here.
I'm an Electrical Contractor. I'm looking at x10 to add some energy controls in a commercial building. We have a 1200A 120/208V supply. 5 different panels to cover the "house" loads. One panel is connected to a 400A backup generator.
What I want to do is use a single timer with multiple programs to control up to 5 different devices (lighting and HVAC contactors) in different panels in the building. Installing the hard-wiring to accomplish this goal is both daunting an costly; this is a only a 5yo building, and was not built with very much fore-thought.
A few questions that come to mind:
- Can a timer or switch and one sub-panel signal switch a device at another sub-panel? (Both subs are fed from the same 'main' panel.)
- How far is the x10 signal good for before it needs to be boosted?
Any input is welcome!